From the Floor

Real Experience from Working Operations

Everything here is from shifts I actually ran. The numbers are before-and-after from the same operation, measured the same way. If something didn't work the way I expected, or if I'd approach it differently now, I say so.

Real data Every article includes the actual numbers: before, after and the timeline in between.
UK operations context All experience is from UK warehouse and logistics environments, with UK regulations, UK staffing realities and UK operational constraints.
Practical takeaways Every article ends with specific actions you can take this week, not broad frameworks or generic advice.
Latest
Case Study New May 2026 · 9 min read

How We Developed Two Underperforming Team Leaders, With Completely Different Plans

Same KPI scorecard flagged both. Same role. Completely different situations. Why fairness in development doesn't mean treating people the same, and the two interventions that actually worked.

GROW + SBI coaching frameworks ~15 hrs weekly rework recovered Both leaders improved
Read Case Study →
100%
Compliance restored
Case Study April 2026 · 8 min read

How We Fixed a Broken Absence Culture (Without Making Half the Team Go Formal)

Absence rates at 20%, no process, no consistency. How we brought it under 3% in 8 months, without triggering mass formal proceedings, without the Bradford Factor, and without losing the team's trust.

20% → <3% absence rate 8 months to change the culture RTW interviews + welfare meetings
Read Case Study →
<3%
Absence rate after 8 months
Case Study April 2026 · 7 min read

How We Planned Peak Labour and Onboarded 10 Agency Staff Without Losing Control

How we forecasted a peak labour gap, compared agency cost against budget, selected temporary support, and prepared induction and training so 10 new starters could contribute without destabilising the floor.

10 agency workers planned for peak Forecast + budget decision Induction + training structure
Read Case Study →
10
Peak-period agency starters
Case Study April 2026 · 9 min read

How to Reduce Picking Errors in a Warehouse: A Root Cause Analysis Case Study

How introducing RCA (Fishbone diagrams and 5 Whys) shifted a UK pharmaceutical warehouse from reactive error management to structured warehouse process improvement, with no new technology.

Root Cause Analysis (RCA) Fishbone + 5 Whys Pharmaceutical logistics
Read Case Study →
No new
tech
Process-led improvement
Case Study April 2026 · 8 min read

How We Improved Warehouse Picking Efficiency by 21% in 12 Months

The measurement framework, warehouse reporting tools and process changes that drove a 21% year-on-year improvement in lines picked per hour, with no new equipment and no capital spend.

103 → 125 LPH 499 hours saved Pharmaceutical logistics
Read Case Study →
21%
LPH improvement
More coming soon

More articles in progress

We publish new case studies and operational insights regularly. Subscribe below to get them as soon as they're live.

Coming Soon

How to Set Up KPI Dashboards Your Warehouse Team Actually Uses

Moving beyond spreadsheets to live operational dashboards: what metrics matter, how to display them and how to make them stick with the team.

KPIsDashboards
Coming Soon

Running a Root Cause Analysis After a Missed SLA

A practical framework for investigating service failures without blame, and building the operational changes that stop them recurring.

SLARCA
Coming Soon

Running a Warehouse H&S Investigation After a Near Miss

How to document, investigate and close out a near-miss incident without creating a blame culture, and what to do with the findings.

H&SInvestigation
Stay in the loop

New articles straight to your inbox

Subscribe and we'll send you new From the Floor articles as they're published. No spam, unsubscribe any time.